As of 6:00 p.m. on Sunday, power has been restored to approximately 60% of affected customers, leaving around 17,800 ...
The transmission line includes 33 miles of new 345 kV transmission line connecting the existing Roundup substation near ...
The project is expected to include an advanced bipolar HVDC transmission system operating at 525 kV, ensuring efficient ...
This initiative, supported by funding from the Bipartisan Infrastructure Law, is designed to enhance the resilience of the ...
Part of the proposed Beauly to Peterhead 400kV overhead line connection, the project will involve construction of an outdoor ...
The pilot aims to address barriers in EV adoption, demonstrate the transformative potential of EV fleets in supporting the ...
Join editorial director Nikki Chandler in this exclusive T&D World QuickChat as we delve into the latest advancements in ...
Itron will partner with local vendors to install more than 1.5 million meters across Puerto Rico as part of its Smart Meter ...
NorthWestern Energy and Grid United have entered into a letter of intent to continue transmission development to further ...
The Bonneville Power Administration’s (BPA) traditional model for deploying transmission capital will not be enough to meet ...
As extreme weather events increase in both frequency and severity across the U.S., T&D utilities are under growing pressure ...
The proposed project, between Wawa TS in Wawa and Porcupine TS in Timmins, aims to support an increase in electricity demand ...